My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-11_REPORT - M1999002 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999002
>
2014-07-11_REPORT - M1999002 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 3:23:14 AM
Creation date
7/14/2014 8:47:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Report
Doc Date
7/11/2014
Doc Name
Annual Fee/Report/Map
From
American Soda, L.L.P.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? YES NO <br /> 3.1.12 Signs and Markers <br /> . . . . (2)The boundaries of the affected area will be marked by monuments or <br /> other markers that are clearly visible and adequate to delineate such <br /> boundaries. <br /> (a) for 110 Limited Impact Operations and Limited Impact 110 <br /> Designated Operations the permit boundary for the purposes of <br /> this Rule shall be considered the affected area; <br /> (b) for 112 Regular Operations and 112 Designated Mining Operations <br /> the area proposed to be disturbed by mining operations for which a <br /> Financial Warranty and Performance Warranty have been posted <br /> shall be the affected area. <br /> Permit sign on gate below pilot test mine pad-marking second boundary. <br /> 77, <br /> 7, <br /> K�• <br /> 4 <br /> ,w <br /> 1' <br /> M <br /> 3. Is the mine site in final reclamation (a II material extraction and stockpile removal <br /> is complete)? If"YES", please note time limits related to completion of YES NO <br /> reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation, processing or hauling activity at the mine? 2013 <br /> The American Soda mining projected involves circulation of hot water through wells to extract sodium <br /> minerals. The last time this activity took place on the permitted site was 2004. In 2006 hauling and <br /> excavation occurred as two ponds, used during the test mine phase, were closed out and reclaimed. This <br /> hauling and excavation was related to reclamation and not mining. In the fall of 2013 the lateral leg <br />
The URL can be used to link to this page
Your browser does not support the video tag.