My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-11_REPORT - C1980007
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2014-07-11_REPORT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:50:52 PM
Creation date
7/11/2014 2:55:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
7/11/2014
From
Hydro Geo, Inc
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Hydrology Report
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine 2013 Annual Hydrology Report 1 <br />1.0 INTRODUCTION <br />This Mountain Coal Company, LLC (MCC) West Elk Mine 2013 Annual Hydrology <br />Report (AHR) summarizes the hydrologic monitoring activities and pertinent data <br />associated with the West Elk Mine mining operations for the Water Year 2013 (WY <br />2013), October 1, 2012 through September 30, 2013, in accordance with the Colorado <br />Division of Reclamation, Mining and Safety (CDRMS) Permit C- 1980 -007. <br />1.1 Overview of Mining Operations <br />The West Elk Mine is an underground coal mining operation that produces bituminous <br />coal and conducts other mining activities including surface crushing, washing, <br />conveying, and load -out operations. MCC has utilized two chemicals in their treatment <br />process: aluminum sulfate for flocculation in sedimentation ponds and sodium <br />hypochlorite for drinking water treatment. <br />During WY 2013, mining was completed in the E -seam longwall panel E3 from crosscut <br />12 up to crosscut 3, and in panel E4 from crosscut 66 up to crosscut 28. Development <br />mining was completed in the E5 headgate from crosscut 74 to crosscut 30, and the E6 <br />headgate from crosscut 3 to crosscut 8. There was no mining in the B -seam in WY 2013 <br />(MCC, 2014). <br />June 2014 HydroGeo, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.