Laserfiche WebLink
OW MINING, LLC <br />Miscellaneous Comments: <br />SECOND QUARTER 2014 POND INSPECTION REPORT <br />Pond Inspection Date: June 26, 2014 <br />1. The SWMP control devices were inspected and all SWMP control devices were found to be in fair <br />condition. Routine post winter quarterly maintenance to sumps was conducted. <br />2. Sediment and Water Level Determination — When sediment enters a pond, it is deposited unevenly, <br />usually collecting at the inlets rather than evenly across the bottom of the pond. Reported sediment levels <br />are based upon the inspector's observations made throughout the quarter during routine inspections in <br />combination with knowledge of the pond structure. The reported pond water level is also determined by <br />observations relative to the various landmarks in the pond (depth to bottom, primary riser, etc.) <br />Notwithstanding comments above, ponds have been maintained as designed and in accordance with the <br />approved plan. <br />Inspected By: <br />Under Direction of: <br />James A. Kiger <br />Benjamin L. Godwin <br />Colorado Registered <br />,tip, <br />�,� _. <br />GJ Q p�Vo o L . A <br />No. 34286 <br />3737 Hwy 133 • P.O. Box 535 • Somerset, Colorado 81434 USA <br />TEL (970)929 -51 22 •4 FAX (970) 929-5177 <br />