Laserfiche WebLink
aGAIN E Eq�yC <br />Huddleston- Berry <br />ingiaeerit►g & Testing, LLC <br />Bowie Resources, LLC <br />43659 Bowie Road <br />Paonia, Colorado 81428 <br />Attention: Mr. Bill Bear <br />Subject: May 2014 Vibrating Wire Piezometer Monitoring <br />Bowie Coal Waste Disposal Area No. 2 <br />Paonia, Colorado <br />610 White Avenue <br />Grand Junction, CO 81501 <br />Phone: 970- 255 -8005 <br />Fax: 970-255-6818 <br />HuddlestonBerry(& bresnan.net <br />www.HBET -GIcom <br />July 9, 2014 <br />Project #01349 -0001 <br />Reference: 9cibilit), Ei,aluation, Teehnical Rei,ision 1155, Gob Pile 92 Diying Area, Boll* <br />No. 2 Kine by Huddleston -Berry Engineering & Testing, LLC for Bowie <br />Resources, LLC, June 3, 2014, <br />Dear Mr. Bear, <br />At the request of the Colorado Division of Reclamation, Mining and Safety (DRMS), <br />Huddleston -Berry Engineering & Testing, LLC (HBET) prepared this letter regarding monthly <br />monitoring of vibrating wire piezometers at Coal Waste Disposal Area No. 2 (CWDA No. 2) at <br />the Bowie mine near Paonia, Colorado. The intent of the monitoring was to detect significant <br />changes in the pore water pressures within the coal waste which may impact the stability of the <br />waste pile. <br />Monitoring <br />Between 2005 and 2012, a total of ten vibrating wire piezometers were installed in CWDA No. <br />2. However, several of the piezometers have been damaged or have otherwise ceased to <br />firnction. Currently, five of the piezometers are functional. <br />Monitoring of the functioning piezometers was completed by Buckhorn Geotech, Inc. (BGI) on <br />May 215, 2014. In addition, during a quality control review of the piezometer data, BGI <br />identified an error in the pore pressure calculations for VWP -08, VWP -09, and VWP -10. BGI <br />determined that the mathematical error resulted in higher pore pressures in these piezometers. <br />The actual pore pressures were lower than previously reported. <br />