Laserfiche WebLink
Mobilization Worksheet Cont'd Task#007 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: DURANGO <br /> Total one-way travel distance: 10.00 miles <br /> Average Travel Speed: 40.00 _ mph <br /> Total Non-Roadable Mob/Demob Cost <br /> '*two round trips with haul rig: $2,342,1� <br /> Total Roadable Mob/Demob Cost** $7.65 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.25 0.25 <br /> Return Time(Hours): 0.25 _ 0.25 <br /> Loading Time(Hours): 1.00 _ NA <br /> Unloading Time(Hours): 1.00 _ NA <br /> Subtotals: V 2.50 0.50 <br /> JOB TIME AND COST <br /> Total job time: 5.00 Hours <br /> Total job cost: $2,350 <br /> CIRCES Cost Estimating Software <br />