Laserfiche WebLink
r <br /> Pagel of 2 <br /> BULLDOZER WORK <br /> Task description: Backfill and Rough Grade <br /> Permit Action: 2014 Inspection- <br /> Site: Montoya Pit BLM Permit/Job#: M 1980146 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None _ <br /> Date: 7/10/2014 County: La Plata _ Filename: M146-005 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DIOT- IOSU <br /> Horsepower: 574 <br /> Blade Type: Semi-Universal _ <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: _ _ $131.86 NA _ <br /> Operating Cost/Hour: $184.48 100 _ <br /> Ripper op.Cost/Hour: $0.00 _ 0 <br /> Operator Cost/Hour: $38.01 1 NA <br /> Total unit Cost/Hour: $354.34 <br /> Total Fleet Cost/Hour: $354.34 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 87,120 <br /> Swell factor: 1.165 <br /> Loose volume: 101,495 LCY <br /> Source of estimated volume: Division of Reclamation,Mining R.Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly production: 1,718.9 LCY/hr <br /> Materials consistency description: Partly consolidated stockpile l.l <br /> Average push gradient: -10% <br /> Average site altitude: 6,700 feet <br /> Material weight: 2,900 lbs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: _ 0.750 (AVG.) <br /> Material consistency: ___ 1.100 -(CAT HB) <br /> CIRCES Cost Estimating Software <br />