Laserfiche WebLink
COST SUMMARY WORK <br /> Task descrjiption: <br /> Permit Action: 2014 Inspection <br /> Site: _Montoya Pit DRMS Permit/Job#: M1980146 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 _ State: Colorado _ Abbreviation: None <br /> Date: 7/1/2014 _ County: La Plata Filename: M146-000 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Descri tion Used Size Hours Cost <br /> 001 Demlish and dispose of debris DEMOLISH 1 0.00 $1,538.94 <br /> 002 Rip compacted Pit Floor RIPPER 1 1.81 $663.00 <br /> 003 Re lace Topsoil and Subsoil(2 ac @9") DOZER 1 2.91 $1,030.00 <br /> 004 Reve etate I REVEGE 1 80.00 $19,486.00 <br /> 005 Mobilize/Demobilize MOBILIZE 1 5.00 $2,350.00 <br /> SUBTOTALS: 89.72 $25,068 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 0.00% Total= $0.00 _ <br /> Performance bond: 0.00% Total= $0.00 <br /> Job superintendent: 44.86 hrs Total= $3,371.68 <br /> Profit: 10.00% Total= $2,506.80 <br /> TOTAL 0&P= $5,878.48 <br /> CONTRACT AMOUNT(direct+0&P)= $30,946.48 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 _ <br /> Engineering work and/or contract/bid preparation: 8.59% _ Total= $2,658.30 <br /> Reclamation management and/or administration: 6.20% $1,918.68 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $10,955.46 <br /> TOTAL BOND AMOUNT(direct+indirect)= $36,023.46 <br />