My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-03_REVISION - M2009023 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009023
>
2014-04-03_REVISION - M2009023 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:28 AM
Creation date
7/10/2014 12:37:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009023
IBM Index Class Name
Revision
Doc Date
4/3/2014
Doc Name
Surety Increase
From
DRMS
To
Skanska
Type & Sequence
SI1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace 10 inches of topsoil over 12.5 acres <br /> Site: ed Mesa Pit _ — Permit Action: 2014 Inspection Permit/Job#; M2009023 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 4/2/2014 County: La Plata Filename: M023-002 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HQURLY EQUIPMENT COSTShift basis: 1 Aer day <br /> Equipment Description <br /> -Scraper: Cat 6370 w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equi Dment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Util' tion-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $110.90 NA NA NA NA NA <br /> Ope ting cost/hour: $243.12 NA NA NA NA NA <br /> Rippe op.cost/hour: NA NA NA NA NA NA <br /> Opekator cost/hour: $33.56 NA NA NA NA NA <br /> Unit Subtotals: $387.59 NA NA NA NA NA <br /> Number of Units: 2 0 0 0 0 0 <br /> Group Subtotals: Work: $775.18 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: 7$ 75.18 <br /> MATERIAL QUANTITIES <br /> Initial volume: 16,133 CCY Swell factor. 1.125 <br /> Loose volume: 18,150 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br /> Mate 'al description: Earth-Dry packed Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.