Laserfiche WebLink
-6- <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the permittee <br />violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresent important material facts; <br />3. If your mining and reclamation operations affect areas beyond the boundaries of an approved petrn.t <br />boundary, substantial civil penalties, to you as permittee can result; <br />4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office: <br />�. It is your responsibility to notify the Office of any changes in your address or phone number; <br />6. Upon permit issuance and prior to beginning on -site minim activity, you must post a sign at the entrance of <br />the mine site, which shall be clearly visible from the access road, «ith the following information (Rule 3 1.12). <br />the name of the operator, <br />a statement that a reclamation perrnit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />#\ C the permit number <br />7. 1'110 boundaries of the permit boundary area must be marked by monuments or other markers that are clearly <br />visible and adequate to delineate such boundaries prior to site disturbance <br />Alv� <br />S It is a provision of this permit that the operations will be conducted in accordance with the terms and <br />conditions listed in your application, as well as with the provisions of the Act and the ConStruction Mater ial Rules <br />and Regulations in effect at the time the permit is issued. <br />Vs- 9. Annually, on the anniversary date of permit issuance, you must submit an amhual fee as specified by Statute, <br />and aii annual report which includes a snap describing the acreage affected and the acreage reclaimed to date (if <br />there are changes from, the previous year), any monitoring required b} t:e Reclamation Plan to be submitted <br />annually on the anniversary date of the permit approval. Annual fees are for the previous year a permit is held For <br />example, a permit with the anniversary date of July 11 1995; the annua: fee is for the period of July 1, 1994 thro=rgh <br />June 30. '1995, Failure to submit )our annual fee and report by the permit anniversary date may result in a civil <br />penalty, revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the <br />permittee, to continue to pay your annual fee to the Office until the Board releases you from vour total reclamation <br />responsibilit,. <br />I � - <br />10. For Joint venture /partnership operators: the signing representative is authorized to sign this document and a <br />Power of attorney (provided by the partner(s)) authorizing the signature of the representative is attached to this <br />application <br />