Laserfiche WebLink
o Spray Foam Insulation <br />The Filter Building is the location where the tailings are dewatered prior to exiting the building for <br />permanent disposal in the tailings /waste rock piles. The water is recycled in the mill. Large filter <br />presses will be installed in this building and will be removed for reclamation. The filters and <br />associated piping will need to be removed for reclamation. This cost is included. <br />The Switch Gear Building houses the transformers and switch gear that provide the proper voltage <br />for all the electrical uses on site. Since the dry building, battery building and filter building will <br />remain and will need heat and lights, the switch gear building should remain to provide this power <br />from the electric pole on site. <br />The battery charger building is the structure that doubles as a snow shed to protect the portal <br />from getting snowed in. This should remain to allow bat access. It will be very solid and also <br />reflects the history of the site. <br />There are 4 - 500 gallon plastic potable water tanks near the main mine portal as shown on all <br />mine maps. These tanks will be removed by pickup truck at mine closure. <br />The storage portals have installed metal gates which prevent entry and the landowner desires that <br />these gates remain to allow future use of the underground storage which is protected from the <br />weather. For this reason, no sealing cost for these portals is included. The main mine portal <br />already has a large and very strong metal door with bat gate installed. No additional work is <br />needed at this portal. <br />The 10,000 gallon diesel tank on skids located east of the filter building will be hauled off site with <br />its secondary containment at the time of mine closure. The two 55 gallon oil drums inside the <br />storage will also be removed for reclamation. <br />Revenue Mine June 2014 L -5 <br />