My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-09_INSPECTION - C1981041
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981041
>
2014-07-09_INSPECTION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:34 PM
Creation date
7/9/2014 10:51:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Inspection
Doc Date
7/9/2014
Doc Name
Inspection Report
From
DRMS
To
Snowcap Coal Company, Inc
Inspection Date
7/2/2014
Email Name
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 2, 2014 C- 1981 - 041 /Roadside Portals MPB <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />• -Air Resource Protection <br />• -Availability of Records <br />N - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />N - Gen. Compliance With Mine Plan <br />NA -Other <br />N - Processing Waste <br />HYDROLOGIC BALANCE - Rule 4.05 <br />N -Roads <br />N - Reclamation Success <br />N - Revegetation <br />N -Subsidence <br />NA - Slides and Other Damage <br />N - Support Facilities On -site <br />N -Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />N - Topsoil <br />COMMENTS <br />Drainage Control 4.05.1, 4.05.2, 4.053; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />I arrived at the South Portal on the morning of July 2, 2014 at 9:30 a.m. I first checked the two points of seepage. <br />The seepage below the concrete the wall is still flowing out from the bottom of the wall, but continues to be less <br />and the puddle that had formed is almost entirely dried up. The seep on the backfill material on the south side is <br />also drying up. See Photo below of the two stakes placed at the top of the seepage. The lower stake was the <br />original demarcation and the upper stake (at 7 feet) is the highest point of saturation. The saturation level is now <br />about two feet below the upper stake at @ 5 feet up- slope. The French Drain ditch is flowing and has a significant <br />bloom of Algae (see Photo No 2). I measured the flow in the flume at 9:45 a.m. and it was flowing at a depth of <br />.21 ft which = 24.9 gpm about 5 gpm less than yesterday. There are no new areas of concern. No earth <br />movement or slides have occurred to date. At 10:20 a.m. I measured the flow at the Outfall 016 discharge and it <br />was 290.4 gpm. <br />There was no flow in the Fontanari ditch and it has completely dried up. The Carey Pond is also dry with a damp <br />bottom. This indicates to me that the ground is very permeable at this location as this pond was entirely full a <br />short time ago. See Photo No 3 below of the Carey Pond. <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.