Laserfiche WebLink
amecqO' <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; underground working remediation and confirmatory drilling; production drilling and <br />blasting; SLF moisture content and density testing; sampling and testing of drain cover fill (DCF) for <br />QC, and sampling and testing of SF material for QA and QC; subgrade surface certification in the <br />PSSA and Phase 2 diversion channel; and SLF surface inspection and certification. <br />II) Laboratory Activities: Laboratory testing continued with permeability, particle size distribution, <br />Atterberg limits, moisture - density relationships, gradations, material classification, and field material <br />sampling were performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Drain Cover Fill sample number DCF -94 and DCF -95 (control samples). <br />Structural Fill sample numbers SF 86 -R and 87 -R (record samples). <br />General Proiect Items <br />Meetings and Discussions: Weekly Contractor Meeting — June 25, 2014 (CC &V, AMEC, Ames); ECA <br />daily safety meetings; and Ames daily safety meetings. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, <br />AMEC, and Ames. <br />Miscellaneous: <br />Drain cover fill crusher processing continued <br />➢ Riprap screen processing continued <br />➢ Soil liner fill placed at the PSSA was moisture conditioned <br />➢ Highway 67 shoulder was seeded <br />Deliveries: None <br />Submitted by: wa Date: July 1, 2014 <br />Bobby Redd, El <br />Reviewed by: Date: July 1, 2014 <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Approved By: <br />Approved By: <br />Date: 7 A//, <br />Date: - 7- <br />2014.06.28 -mle2 weekly final Page 4 of 7 <br />