My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-08_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-07-08_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:33 PM
Creation date
7/9/2014 8:47:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/8/2014
Doc Name
Weekly construction quality assurance report week ending 6/28/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RI <br />C PPLE CREEK & VICTOR GOLD MINING Co. ameO- <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) & HWY 67 RE- ALIGNMENT MONITORING WEEKLY REPORT <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: June 28, 2014 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 06.22.2014 through 06.28.2014 <br />Days S� M <br />T W <br />T <br />F S <br />- <br />Work Shifts <br />D <br />D <br />D <br />D! D � <br />D =Day Shift N =Night Shift W= Weather day <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 78 °F to 68°F loud Cover: Partly cloudy <br />Lows: 39 °F to 47 °F Precipitation: Afternoon rain, Mon & Wed <br />Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA) <br />Topsoil /Overburden Stripping: No topsoil or overburden stripping took place during this <br />reporting period. <br />Tree Grubbing and Clearing, Chipping: <br />None. <br />Production Drilling: Production drilling was performed within the VLF limits. <br />Production Blasting: Two production blast occurred within the VLF. <br />Structural Fill: <br />All structural fill material discussed below was placed and compacted per the technical <br />specifications. <br />Material was loaded into Cat 740 haul trucks from the northern end of the PSSA floor at the toe of <br />the slopes; a John Deere 850 excavator loaded Cat 740 haul trucks with shot rock from the <br />northern cut area of the PSSA near Bench A. Cat dozers were cutting material from the Ball Mill <br />crossing. All material from these areas was transported to the buttress fill area upslope of <br />stations J12 +00 to J14 +00 and downslope of stations J16 +00 to J20 +00 where it was placed as <br />structural fill by Cat dozers. <br />2014.06.28 -mle2 weekly final Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.