My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-09_PERMIT FILE - C1981038A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2014-06-09_PERMIT FILE - C1981038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 10:05:38 AM
Creation date
7/8/2014 11:11:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
6/9/2014
Section_Exhibit Name
Volume 8A - Soil Loss Comparison
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 RESULTS <br />3.1 Summary <br />The revegetation evaluated for Phase II Bond Release comprised approximately 24 acres. A total <br />of 46 plant taxa were observed within both revegetation areas evaluated in 2013. These species <br />included 13 grass taxa, 23 forbs, 1 sub - shrub, and 10 shrubs and trees (Table 1). Found in relatively <br />small quantities were the noxious weeds, Russian knapweed (Acropti /on repens), musk thistle (Carduus <br />nutans), Canada thistle (Cirsium arvense), and field bindweed (Convovu /us arvensis). In addition, the <br />ubiquitous, invasive species cheatgrass (Anisantha tectorum), and Japanese brome (Bromus japonicus) <br />were also present in small quantities. With regard to the Phase II Bond Release success standard, the <br />West Mine's perennial average cover of 53.93% with an additional 6.09% contributed from annual and <br />biennial cover (equates to the maximum of 10% relative cover allowable) totals 60.02% (Chart 1). This <br />value modestly exceeds the success criterion of 54% (90% of the Total Plant Cover Standard). With <br />regard to the Phase II Bond Release success standard, the Run of Mine's perennial average cover of <br />49.50% with an additional 4.77% contributed from annual and biennial cover totals 54.27 %. This value <br />substantially exceeds the success criterion of 36% (90% of the Total Plant Cover Standard). Both of <br />these units therefore pass the Phase II Bond Release success comparison. <br />Chart i <br />Bowie #1 Mine - Phase II Bond Release <br />Total Plant Cover Standard Comparison - 2013 <br />70 _ <br />60 <br />60.02 <br />- - -_ -- <br />— <br />54.27 <br />50 <br />U <br />V <br />m <br />West Mine <br />o. 40 <br />Success <br />Perennial Cover - <br />Criterion - <br />— — — — — — — <br />- - -- <br />i0 <br />53.93 <br />901/o of Total <br />30 <br />Plant Cover <br />Perennial Cover - <br />Annual & Biennial <br />Standard <br />49.50 <br />a <br />Contribution - <br />(60%) <br />Run of Mine <br />6.09 <br />Annual & Biennial <br />20 <br />Cover - 4.77 <br />Criterion - <br />900% of Tota I <br />Plant Cover <br />Standard <br />10 <br />(40 %) <br />0 <br />West Mine Success Criterion Run of Mine Success Criterion <br />CEDAR CREEK ASSOCIATES, INC. Page 12 Bowie #1 Mine - 2013 <br />Phase II Bond Release Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.