My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-09_PERMIT FILE - C1981038A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2014-06-09_PERMIT FILE - C1981038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 10:05:38 AM
Creation date
7/8/2014 11:11:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
6/9/2014
Section_Exhibit Name
Volume 8A - Soil Loss Comparison
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 Background, Success Standards, and Evaluation <br />Information regarding dates of reclamation earthwork activities and seeding dates should be <br />provided in other supporting documents. <br />The bond release success standards for reclaimed areas at the Bowie #1 Mine are based on <br />vegetation cover, annual herbaceous production, and woody plant density values of reclaimed areas <br />compared with the success criteria. For Phase II Bond Release, reclaimed areas must achieve at least <br />90% of the Total Plant Cover Standard. Diversity, production and woody plant density success <br />comparisons are applicable only to Phase III Bond Release and thus are not discussed in this Phase II <br />Bond Release evaluation. Noxious weed cover may not count towards vegetation success standards. A <br />determination regarding noxious weed status is based on the Delta County noxious weed list. <br />Success criteria for Phase II Bond Release are as follows: <br />• For the West Mine Unit, Phase II Bond Release requirements state that Total Plant Cover must �Pr� ,4- uol <br />be ? 90% of the Total Plant Cover Standard of 60% (54 %). The Total Plant Cover may not °S <br />include noxious weeds, and annual and biennial species cover is limited (see discussion below). Pa <br />For the Run of Mine Unit, Phase II Bond Release requirements state that Total Plant Cover must UPS <br />be >: 90% of the Total Plant Cover Standard of 40% (36 %). The Total Plant Cover may not qp�,, �• , P+ _ 3 <br />include noxious weeds, and annual and biennial species cover is limited (see discussion below). S_,,344, p. <br />Success criteria for Phase III Bond Release in the West Mine unit are as follows: <br />• Achieve a Total Plant Cover of >_ 90% of the Total Plant Cover Standard of 60% (54 %). ✓ <br />• Achieve a woody plant density of >: 90% of 1,000 stems per acre (900). ✓ Vo1 `I R pS 5 4,1 Aeg P +3 Vk <br />• Achieve annual herbaceous production levels of >_ 90% of 450 pounds per acre (405). <br />• Achieve a species diversity of >_ 5 native, perennial herbaceous species with between 3% and ✓ <br />60% relative cover. <br />• Achieve a species diversity of > 4 native, cool- season grass species with between 3% and 60% ✓ <br />relative cover. <br />• Achieve a species diversity of >_ 1 native forb species with between 3% and 60% relative cover. <br />• Achieve a species diversity of >_ 2 native shrub species, not exceeding a relative cover value of ✓ <br />>_ 80 %. <br />Success criteria for Phase III Bond Release in the Run of Mine (and East Mine) units are as follows: <br />CEDAR CREEK ASSOCIATES, INC. Page 6 Bowie #1 Mine - 2013 <br />Phase II Bond Release Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.