My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-01_PERMIT FILE - C1981028
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028
>
2014-07-01_PERMIT FILE - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:11 PM
Creation date
7/8/2014 10:08:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Permit File
Doc Date
7/1/2014
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 38 of 39 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilization and Demobilization of Equipment <br />Site: Keenesburg Strip Mine Permit Action: MT6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: JO1 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: ME <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: CO28 -JO1 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26-50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />1 $88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />CosVbr/ fleet <br />Cost/ fleet <br />$58.20 <br />TONS <br />$58.20 <br />$58.20 <br />Fuel Tanker, 6x4 210 HP <br />fleet <br />1 <br />$65.37 <br />Cat D9T - 9SU <br />66.13 <br />$78.33 <br />$125.45 <br />2 <br />$407.55 <br />$250.90 <br />$500.00 <br />ATLAS COPCO <br />0.00 <br />$49.55 <br />$88.67 <br />1 <br />$138.22 <br />$88.67 <br />$250.00 <br />ROC D7- 11,4.0 in. <br />CAT 14M <br />23.57 <br />$37.98 <br />$88.67 <br />1 1 <br />$126.65 <br />$88.67 <br />$250.00 <br />Cat 637G w/push- <br />59.59 <br />$100.38 <br />$125.45 <br />4 <br />$903.33 <br />$501.80 <br />$1,000.00 <br />Pull <br />Subtotals: 1 $1575.75 1 $930.04 1 $2,000.00 <br />ROADABLE EOUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Generic 12 -18 cy, 6x4 <br />$109.22 <br />6 <br />$655.32 <br />$655.32 <br />Water Tanker, 3,500 Gal. <br />$75.97 <br />1 <br />$75.97 <br />$75.97 <br />Water Tanker, 2,500 Gal. <br />$58.20 <br />1 <br />$58.20 <br />$58.20 <br />Fuel Tanker, 6x4 210 HP <br />$65.37 <br />1 <br />$65.37 <br />$65.37 <br />Lube Truck, 6x4, 210 HP <br />$57.53 <br />1 <br />$57.53 <br />$57.53 <br />Subtotals: 1 $91239 1 $912.39 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.