Laserfiche WebLink
Page 35 of 39 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />12.00 <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />15.00 <br />LCY <br />Adjusted Volume: <br />14.79 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes <br />Loading Tool Capacity <br />14.20 LCY <br />Bucket Size Class: Large <br />Rated Capacity: 2.080 LCY ea ed <br />Bucket Fill Factor: 0.975 Loose material - mixed moist aggregates <br />I <br />Adjusted Capacity: 2.028 LCY <br />Job Condition Corrections: Site Altitude (ft.): 4000 feet <br />-100 %) 0.975 <br />Net Correction: 0.830 0.830 <br />Loadine Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.10( <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />7 passes <br />NA minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />-100 %) 0.975 <br />Net Correction: 0.830 0.830 <br />Loadine Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: ABOVE AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.10( <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />7 passes <br />NA minutes <br />Cycle Time Factors <br />Factor min. <br />Source <br />Material: <br />NA <br />NA <br />Cat HB <br />Stockpile: <br />NA <br />NA <br />Cat HB <br />Truck Ownership: <br />NA <br />NA <br />Cat HB <br />Operation- <br />NA <br />NA <br />Cat HB <br />Dump Target: <br />I NA <br />NA <br />Cat HB <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Tune: 1.504 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: NA minutes <br />Adjusted Loader Cycle Time: 0.234 minutes <br />Net Load Time per Truck: 1.504 minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 1.504 Minutes <br />Minutes Adjusted for site altitude: 0.900 Minutes <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />CIRCES Cost Estimating Software <br />