Laserfiche WebLink
Page 33 of 39 <br />BOREHOLE SEALING WORK <br />Task description: Seal 7 wells <br />Site: Keenesburg Strip Mine Permit Action: MT6 <br />PROJECT IDENTIFICATION <br />Task #: HO1 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28 -HO1 <br />Borehole <br />Sealing/Item <br />Description <br />Method <br />Diameter <br />Length <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />FPW1 <br />Portland cement <br />8 <br />60.5 <br />17.80 <br />bag <br />$11.50 <br />$204.70 <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />Water supply <br />Portland cement <br />8 <br />620 <br />183.05 <br />bag <br />$11.50 <br />$2,105.08 <br />well <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />DH96 <br />Portland cement <br />5 <br />55.58 <br />5.93 <br />bag <br />$11.50 <br />$68.20 <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />DH122 <br />Portland cement <br />5 <br />55.25 <br />5.08 <br />bag <br />$11.50 <br />$58.42 <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />SMW -2 <br />Portland cement <br />4.75 <br />97 <br />10.17 <br />bag <br />$11.50 <br />$116.96 <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />AMW -1 <br />Portland cement <br />4.5 <br />58.5 <br />3.89 <br />bag <br />$11.50 <br />$44.74 <br />grout ( Bag, material <br />cost onl ...94 lb. bag) <br />AMW -2 <br />Portland cement <br />6 <br />49 <br />8.47 <br />bag <br />$11.50 <br />$97.41 <br />grout ( Bag, material <br />cost only ...94 lb. bag) <br />cut casing <br />Borehole <br />NA <br />NA <br />7.00 <br />EA <br />$2.81 <br />$19.67 <br />location/identification <br />marker (EA, material <br />cost only) <br />drill rig time <br />ATLAS COPCO <br />NA <br />NA <br />16.00 <br />EA <br />$173.04 <br />$2,768.64 <br />ROC D7- 11,4.0 in. <br />water truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />16.00 <br />EA <br />$48.14 <br />$770.24 <br />time <br />Gal. <br />Job Hours: 16.00 <br />Total Cost: $6,254.06 <br />CIRCES Cost Estimating Software <br />