My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-01_PERMIT FILE - C1981028
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028
>
2014-07-01_PERMIT FILE - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:11 PM
Creation date
7/8/2014 10:08:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Permit File
Doc Date
7/1/2014
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 31 of 39 <br />DEMOLITION WORK <br />Task description: Facilities and structural demoliti4 <br />Site: Keenesburg Strip Mine Permit Action: MT6 <br />PROJECT IDENTIFICATION <br />Task #: GO 1 State <br />Date: 3/26/2014 County <br />User: JLE <br />Agency or organization name: <br />UNIT COSTS <br />Colorado <br />Weld <br />DRMS <br />Permit/Job#: C1981028 <br />Abbreviation: None <br />Filename: CO28 -GO1 <br />Location adiustment: 96.90 % <br />Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />Powder magazine <br />21' x 28' x <br />Bldg. (SN) <br />5,880.00 <br />CF <br />$0.18 <br />$1,046.64 <br />- cinder block <br />101, <br />demotion -site <br />walls <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Powder magazine- <br />21'x 28' <br />Demo. and on -site <br />588.00 <br />SF <br />$1.13 <br />$666.20 <br />concrete floor <br />disposal in existing <br />pit, 4 in. thick - Max. <br />10,000 ft. haul <br />Office Building- <br />81" x 70' <br />Bldg. (SN) <br />56,700.00 <br />CF <br />$0.18 <br />$10,092.60 <br />metal structure <br />x10'h <br />demo. /on -site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Office building <br />81' x70' <br />Demo. and on -site <br />5,670.00 <br />SF <br />$1.13 <br />$6,424.11 <br />floor &foundation <br />disposal in existing <br />pit, 4 in. thick - Max. <br />10,000 ft. haul <br />Shop building- <br />61' x70' x <br />Bldg. (MIN) <br />119,560.00 <br />CF <br />$0.20 <br />$24,031.56 <br />metal <br />28'h <br />demo. /on -site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Shop building- <br />61'x 70'x <br />Demo. and on -site <br />42,700.00 <br />SF <br />$3.40 <br />$145,137.30 <br />floor <br />Fth <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 10,000 ft. haul <br />Storage shed <br />18'x 11' x <br />Bldg. (SN) <br />2,376.00 <br />CF <br />$0.18 <br />$422.93 <br />12'h <br />demo. /on -site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Storage area, misc. <br />27000 cy <br />Bldg. (SN) <br />27,000.00 <br />CF <br />$0.18 <br />$4,806.00 <br />equipment & <br />demo. /on -site <br />supplies <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Remove powerline <br />6000 lin. ft. <br />Powerline or <br />6,000.00 <br />LF <br />$2.60 <br />$15,588.00 <br />telephone line, <br />overhead, wood - <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.