Laserfiche WebLink
Task description: Topsoil <br />Site: Keenesburg Strip Mine <br />Page 17 of 39 <br />SCRAPER TEAM WORK <br />B -Pit <br />Permit Action: MT6 <br />PROJECT IDENTIFICATION <br />Task #: E01 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Pemrit/Job#: C1981028 <br />Abbreviation: None <br />Filename: CO28 -E01 <br />COSTShift basis: 1 per day <br />Road Maintenance Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br />('net Rrrakdawn- Ccraner Wnrk Team Sunnnrt F.auinment Maintenance Eauipment <br />Total work team cost/hour: $2,180.53 <br />MATERIAL OUANTITIES <br />Initial volume: 172,562 CCY Swell factor: 1.060 <br />Loose volume: 182,916 LCY <br />Source of estimated volume: Est. B -Pit Area, Parcels 30, 31 and 32 (Areas not Phase 2) <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />100 <br />100 <br />25 <br />25 <br />Ownership cost/hour: <br />$100.38 <br />NA <br />$69.88 <br />$69.88 <br />$37.98 <br />$10.68 <br />Operating cost/hour: <br />$242.98 <br />NA <br />$146.66 <br />$146.66 <br />$17.36 <br />$9.37 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$38.82 <br />NA <br />$38.85 <br />$38.85 <br />$37.83 <br />$27.82 <br />Unit Subtotals: <br />$382.18 <br />NA <br />$255.39 <br />$255.39 <br />$93.17 <br />$47.86 <br />Number of Units: <br />4 <br />0 <br />1 <br />1 <br />1 <br />1 1 <br />Group Subtotals: <br />Work: <br />$1,528.72 <br />Support: <br />$510.78 <br />Maint: <br />1 $141.03 <br />Total work team cost/hour: $2,180.53 <br />MATERIAL OUANTITIES <br />Initial volume: 172,562 CCY Swell factor: 1.060 <br />Loose volume: 182,916 LCY <br />Source of estimated volume: Est. B -Pit Area, Parcels 30, 31 and 32 (Areas not Phase 2) <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) <br />Material weight: <br />2,850 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Sand - Damp <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />28.63 LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />CIRCES Cost Estimating Software <br />