Laserfiche WebLink
Page 8 of 39 <br />TRUCK/LOADER TEAM WORK <br />Task description: Pick up and haul asphalt from access road to B -Pit <br />Site: Keenesburg Strip Mine Permit Action: MT6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: C01 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 12 -18 c , 6x4 <br />- Loader: CAT 966H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: CO28 -COI <br />Shift basis: 1 per day <br />Cnct Breakdown- Trnck/Londer Team Snnnnrt Fniiinment Maintenance. Frminment <br />Total work team cost/hour: $921.17 <br />MATERIAL QUANTITIES <br />Initial volume: 6,505 CCY Swell factor: 1.400 <br />Loose volume: 9,107 LCY <br />Source of estimated volume: 4.2 mile x 24' w x .33' th. <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,800 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 17.96 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />15 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$14.43 <br />$34.06 <br />$69.88 <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$67.87 <br />$64.79 <br />$22.00 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$26.92 <br />$36.27 <br />$38.85 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$109.22 <br />$135.12 <br />$130.73 <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />1 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $790.44 <br />Support: $130.73 <br />Maint: $0.00 <br />Total work team cost/hour: $921.17 <br />MATERIAL QUANTITIES <br />Initial volume: 6,505 CCY Swell factor: 1.400 <br />Loose volume: 9,107 LCY <br />Source of estimated volume: 4.2 mile x 24' w x .33' th. <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,800 Pounds/LCY <br />Description: User Provided <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 17.96 LCY <br />CIRCES Cost Estimating Software <br />