Laserfiche WebLink
Page 5 of 39 <br />MOTOR GRADER WORK <br />Task description: Final grade 49 acres within long term spoil area <br />Site: Keenesburg Strip Mine Permit Action: MT6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: A03 State: <br />Date: 3/26/2014 County: <br />User: JLE <br />Colorado <br />Weld <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Abbreviation: None <br />Filename: CO28 -A03 <br />Basic Machine: CAT 14M <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />mph <br />Selected Application: <br />Finish grading <br />(0 -2.5 mph) - 1.5 <br />Utilization % <br />Ownership Cost/Hour: <br />$41.37 <br />NA <br />Operating Cost/Hour: <br />$69.42 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.83 <br />NA <br />Total Unit Cost/Hour: <br />$148.62 <br />Job Condition Correction Factors <br />Total Fleet Cost/Hour: $152.14 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped <br />49.00 <br />acres <br />Source of estimated acreage: 2010 ARR <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading <br />(0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 4000 feet <br />Source <br />Altitude Adj: 1.00 <br />(CAT HB) <br />Job Efficiency: 0.90 <br />(1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.6527 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.6527 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: <br />29.65 Hours <br />Unit cost: $89.92 per acre Total job cost: <br />$4,406.00 <br />CIRCES Cost Estimating Software <br />