Laserfiche WebLink
A summary of the CEC acreages disturbed, those already reclaimed, and acreage <br />remaining to be reclaimed is presented below. This information is current as of the Afm <br />report for 2010, and is updated annually in that report: <br />Disturbed areas (approximate acreages): <br />B- Pit/local areas [A -Pit is closed] <br />32 acres <br />Long -term spoil area <br />49 acres, <br />Tops" and piles A -1, A -3, B -1 and B -2t <br />20 acres <br />Main Access Road <br />42 acres <br />Sediment Pond 2 & other non - reclaimed areas <br />38 acres <br />Facilities area <br />6 acres <br />Total area remaining to be reclaimed <br />187 acres <br />Total area reclaimed and revegetated <br />251 acres <br />Grand Total. , <br />438 acres <br />• Also, the following information provides a summary 'soil balance of both the overburden <br />soils and topsand volumes: <br />0 <br />OVERBURDEN SOILS <br />Quantities Required <br />B -Pit (6 foot cover) — [A -Pit closed] 218,868 BCY <br />B -Pit (A/MWR intermediate cover) 92,861 BCY <br />Total 311,729 BCY <br />Stockpiled Ouantit <br />Long -term spoil area 340,895 BCY <br />- 311,729 BCY -from above <br />Total Remaining ** 29,166 BCY -- surplus <br />* *Total soil materials remaining will be graded (sloped) and revegetated. <br />` Topsand pile B -2 has been incorporated within pile A -3 for reference and mapping purposes. <br />114a 7/11 <br />