My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-02_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-07-02_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:23 PM
Creation date
7/8/2014 9:48:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/2/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Trailer Mounted Filter Press <br />Site: Bowie No. 2 Mine <br />PROJECT <br />IDENTIFICATION <br />Task #: <br />OOP <br />Date: <br />7/1/2014 <br />User: <br />SLB <br />COST SUMMARY WORK <br />Permit Action: Minor Revision <br />154 Permit/Job #: C1996083 <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -00p <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />I Size <br />Task <br />Hours <br />Cost <br />368 <br />Remove Trailer Mounted Filter Press <br />DEMOLISH <br />I 1 <br />0.00 <br />$410.25 <br />SUBTOTALS: <br />0 <br />$410 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />0.00 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />$8.28 <br />$4.31 <br />$0.00 <br />$41.00 <br />$53.59 <br />$463.59 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = <br />$18.54 <br />Reclamation management and /or administration: <br />3.13% <br />$14.51 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$86.64 <br />TOTAL BOND AMOUNT (direct + indirect) = $496.64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.