Laserfiche WebLink
William A. Bear <br />Page 4of5 <br />July 7, 2014 <br />i <br />f {� <br />I <br />46. On April 24, 2014, the Division emailed an additional adequacy item to BRL based on <br />comments received from the Division of Water Resources regarding the water augmentation <br />plan and the need for an update to include the increased evaporative loss associated with the <br />expansion of Pond J, as well as the need to address the Division of Water Resource's <br />requirement that all impounded waters be released within 72 hours of capture. BRL <br />subsequently revised the plan for Pond J to decrease the sediment storage in order to keep the <br />primary spillway elevation at the previously approved elevation to maintain compliance with <br />the current augmentation plan. As previously discussed under TR -87, the Division was of the <br />understanding that increasing the aerial extent of the pond surface would increase the <br />evaporative loss from the pond. BRL has contacted the Division of Water Resources for <br />clarification on this issue. Once we get clarification, we can determine how to proceed on this <br />issue. <br />47. Please provide a replacement page EXH -8 -173 that notes that pages EXH -8 -173 through EXH - <br />8-180xxviii-e are intentionally left blank. <br />