Laserfiche WebLink
Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Move material for grading of highwall <br /> Site: White River S&G Pit Permit Action: SI-2 Permit/Job#: M 1991009 <br /> PROJECT IDENTIFICATION <br /> Task#: OlA State: Colorado Abbreviation: None <br /> Date: 7/2/2014 County: Rio Blanco Filename: M009-01a <br /> ----------- ----- --- <br /> User: THM — — <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: Iper day <br /> Equipment Description <br /> - ---- — --- -- -- - <br /> -Scraper: Cat 627G w/push-pull <br /> -Dozer: Cat D8T-8SU <br /> - Support Equipment-Load Area: NA <br /> - -_Dump Area: <br /> Road Maintenance-Motor Grader: NA <br /> -Water Truck- ', NA <br /> Cot Breakdown: Screr Work Team Support Equipment Maintenance Equipment <br /> - - ap-- Scraper Dozer Load Area Dump Area Motor Grader F Water Truck <br /> 10%Utilization-machine: 100_ � 0 I NA I NA NA NA <br /> Ownership cost/hour: $72.62 $62.67 NA NA NA NA <br /> Operating cost/hour: $187.56 $108.22 NA NA — NA j NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $33.56 — $38.01 NA NA NA NA <br /> Unit Subtotals: $293.74 $208.90 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $796.38 Support_ $0.00 —Maint4 _ $0.00 <br /> Total work team cost/hour: $796.38 <br /> MATERIAL QUANTITIES <br /> Initial volume: 17,775 CCY Swell factor: 1.125 <br /> Loose volume: 19,997 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety—� <br /> Source of estimated swell factor: Cat Handbook - <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 Ibs/LCY Struck Volume: 15.70 LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 22.00 LCY <br /> 75%Earth <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 19.92 LCY Adjusted Capacity: 18.85 LCY <br /> CIRCES Cost Estimating Software <br />