Laserfiche WebLink
L R-C,� F� �� �� Page 2 of 3 <br /> 112c Annual Report <br /> Permittee Name: Lake County Permit Number: M-1977-459 <br /> Operation Name: Lake County Grav Pit County: Lake <br /> Annual Fee Due: $791.00 Anniversary Date: July 8,2014 <br /> Permit Acreage: 55.97 Current Bond Amt: $0.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year,on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee,an Annual Report and map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while c, ompleting this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). (7 NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? ,Z o0 <br /> 5. Does the mine operate more than 180 days per year YES <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YECO <br /> b) approval for INTERMITTENT OPERATION? NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. R1 F-GEIVED <br /> 10. Estimated new acreage to be affected in the next report year. 0 <br /> JUI 0 3 2014 /1 <br /> 11. Estimated acres to be reclaimed in the next report year. O1V1"OF RECLAMATION V <br /> MINING AND SAFETY <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ /\ <br /> (/ approved mix: v re laced: a roved mulch: CJ <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: method: <br />