My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-02_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2014-07-02_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:23 PM
Creation date
7/3/2014 10:20:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
7/2/2014
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
5/20/2014
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thistle and Houndstounge were noted in several areas of the RPEE. The operator indicated that <br />a contractor has been recently employed on site for spraying and mitigation. Signs of spot <br />spraying were evident. Continued monitoring will be needed. <br />Signs and Markers (Rule 4.02): <br />The mine identification sign at the entrance from State Highway 133 is intact and contained all <br />necessary information in accordance with 4.02.2. The topsoil stockpile was marked in <br />accordance with 4.02.7. <br />General Compliance: <br />All areas were clean and orderly at the time of inspection. No disturbance to areas outside of the <br />permit area was noted. No compliance issues were noted and no enforcement actions were taken <br />as a result of this inspection. <br />Maintenance items identified during inspection: <br />• Reseeding is needed on the top embankment at the RPE Pond (east cell). <br />• Continued monitoring and weed mitigation will need to be continued. <br />• Ensure that reseeding efforts regarding the topsoil stockpile are successful to minimize <br />any potential wind/water erosion. If germination is not timely, a reseeding will need to <br />be rescheduled. <br />• Maintenance of the rilling observed along the toe of Bench 1 at RPEE should be <br />scheduled to ensure overall stability. <br />• Maintenance on the steep slope (east side of RPEE) regarding the dilapidated fiber <br />matting material and straw waddles will need to be scheduled as well as any reseeding <br />that may be necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.