Laserfiche WebLink
• Ensure that surface runoff is not diverting over the face of the refuse piles <br />• Ensure that Gob Pile #1 has been constructed in accordance with the Rules. If not, <br />regrading will be required before redistribution of topsoil and revegetation <br />