Laserfiche WebLink
June 25, 2014 <br />2.4 Placement and Compaction of Fill Materials <br />A minimal amount of work was done the fill this quarter. The 7600' and the 7625' elevations were <br />contoured by dozers on the far north east portion of the dump. <br />At the end of the second quarter of 2014, the north half of the dump was at the 7600' through 7630' <br />levels. On the south half of the fill was at the 7600' through the 7740'elevation. <br />Photograph 5 depicts the west facing slope of the fill in the area where the slope of the fill is at 3H:1V. <br />Photograph 5: West Side Fill 3H:1V Face Looking South (612512014) <br />2.5 Revegetation <br />No topsoil was placed on the fill this quarter. <br />3.0 References <br />Agapito Associates, Inc. (2009), "Horse Gulch Fill Stability Analysis" submitted to Trapper Mining, Inc., <br />May 29. <br />Colorado Division of Minerals and Geology (1980), "Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining," revised 9/14/05, Section 4.09.1. <br />5 <br />