Laserfiche WebLink
King Mines C1981035 Technical Revision No. 22 Page 6 of 8 <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.600 <br />(FND -SF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3369 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />156.42 LCY/hr <br />156.42 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.577/LCY <br />Total job time: <br />Total job cost: <br />3.00 Hours <br />$270 <br />CIRCES Cost Estimating Software <br />