Laserfiche WebLink
Task description: Exploration Holes CO -14 -01 <br />Site: King Coal Mine <br />PROJECT IDENTIFICATION <br />Task #: OOA <br />Date: 7/2/2014 <br />User: SLB <br />COST SUMMARY WORK <br />CO -14 -09 <br />Permit Action: Technical <br />Revision 22 <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit /Job #: C1981035 <br />Abbreviation: None <br />Filename: C035 -00a <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />409 <br />Seal Boreholes CO -14 -01 through CO -14 -09 <br />BOREHOLE <br />1 <br />36 <br />$12,032.74 <br />410 <br />1 <br />$637.00 <br />Regrade drill pads and pits CO -14 -01 through CO- <br />DOZER <br />7.06 <br />TOTAL O & P = <br />14 -09 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) _ <br />$16,939.02 <br />411 <br />Replace topsoil on CO -14 -01 through CO -14 -09 <br />DOZER <br />1 <br />3.00 <br />$270.00 <br />disturbance <br />412 <br />Broadcast seed CO -14 -01 through CO -14 -09 <br />REVEGE <br />1 <br />18.00 <br />$2,041.00 <br />disturbance <br />SUBTOTALS: <br />64.06 <br />$14,981 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$302.62 <br />Performance bond: <br />1.05% <br />Total = <br />$157.30 <br />Job superintendent: <br />0.00 hrs <br />Total = <br />$0.00 <br />Profit: <br />10.00% <br />Total = <br />$1,498.10 <br />Total = <br />$0.00 <br />TOTAL O & P = <br />$1,958.02 <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) _ <br />$16,939.02 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />6.00% <br />Total = <br />$1,016.34 <br />Reclamation management and /or administration: <br />4.50% <br />$762.26 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$3,736.62 <br />TOTAL BOND <br />AMOUNT (direct + indirect) _ <br />$18,717.62 <br />