My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-02_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-07-02_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:24 PM
Creation date
7/3/2014 9:32:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
7/2/2014
Doc Name
Cost Estimate
From
DMRS
To
Bowie Resources, Inc
Type & Sequence
TR87
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No. 87 <br />Haul Route: <br />Page 5 of 5 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />2450.00 <br />-1.60 <br />3.00 <br />1.40 <br />2895 <br />0.939 <br />Haul Time: 0.939 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />2450.00 <br />1.60 <br />3.00 <br />4.60 <br />2814 <br />0.896 <br />Loading Tool unit <br />Production <br />Truck Unit Production <br />Optimal No. of Trucks: <br />Return Time: 0.896 <br />Total Truck Cycle Time: 6.309 <br />185.10 LCY/Hour Adjusted for job efficiency: <br />104.86 LCY/Hour Adjusted for job efficiency: <br />2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 174.06 <br />Adjusted single truck/loader team production: 153.64 <br />Adjusted multiple truck/loader team production: 153.64 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.478 /LCY <br />minutes <br />minutes <br />153.64 LCY/Hour <br />87.03 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total job time: 5.94 Hours <br />Total job cost: $1,349 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.