Bowie No. 2 Mine C1996083 Technical Revision No. 87 <br />Page 3 of 5 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Material from cover pile east of Pond F to Pond D <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 87 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 367 State: Colorado <br />Date: 6/30/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 10 -12 cy, 6x4 <br />- Loader: CAT 914G <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -367 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $227.15 <br />MATERIAL OUANTITIES <br />Initial volume: 783 CCY Swell factor: 1.165 <br />Loose volume: 912 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.65 <br />$12.24 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.40 <br />$25.68 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.13 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$76.05 <br />$75.05 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $227.15 <br />Support: $0.00 <br />Maine $0.00 <br />Total work team cost/hour: $227.15 <br />MATERIAL OUANTITIES <br />Initial volume: 783 CCY Swell factor: 1.165 <br />Loose volume: 912 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: <br />Material weight: <br />2,900 <br />Description: <br />Decorr <br />Rated Payload: <br />35,400 <br />Payload Capacity: <br />12.21 <br />Pounds/LCY <br />rock - 50% Rock, 50% Earth <br />Pounds <br />LCY <br />CIRCES Cost Estimating Software <br />