Laserfiche WebLink
Idarado Mining Company <br /> 2012/2013 Annual Report <br /> Permit Number: M-1977-403-HR <br /> Anniversary Date: Jul 1,2014 <br /> Idarado Mining Company (IMC) is implementing remediation and reclamation activities pursuant to the <br /> Consent Decree(D. Colorado Civil Action No. 83-C-2385)between the State of Colorado Department of <br /> Public Health and Environment(CDPHE),the State of Colorado Office of Attorney General,and IMC. <br /> All field reclamation and remediation activities prescribed by the Remedial Action Plan(RAP)have been <br /> completed. Monitoring and maintenance of these reclamation and remedial activities are being performed <br /> and will continue to be conducted until each of the performance criteria is achieved or modified. <br /> Site activities conducted during the anniversary year related to the permit included: <br /> 1. Conducting operation and maintenance of the RAP remedial elements where monitoring activities <br /> determined that repairs or maintenance was required. All monitoring and maintenance activities <br /> were completed according to the specifications and requirements of the RAP. Operation, <br /> maintenance and monitoring activities consist of: <br /> • Inspecting, cleaning and repairing, as necessary, runoff diversion and conveyance channel <br /> systems at the Telluride and Red Mountain tailing piles during the spring and fall seasons, <br /> • Performing diversion channel inspections and maintenance,as necessary,following substantial <br /> storm events, <br /> • Conducting visual inspections of the Telluride and Red Mountain tailing piles, <br /> • Conducting and monitoring rodent control on the Telluride and Red Mountain tailing piles, <br /> • Performing remediation of bare areas on Telluride Tailings Pile 4 and 5/6 according to the <br /> approved Bare Area Work Plan for the Idarado Tailing Piles, <br /> • Managing water from the Red Mountain and Telluride underground mine workings throughout <br /> the reporting period in accordance with the RAP provisions,including routine maintenance of <br /> the Mill Level infiltration lagoons and maintenance of the Treasury Tunnel portal. <br /> • Monitoring vegetation cover and density of the Telluride and Red Mountain tailing piles, <br /> • Performing periodic water quality monitoring according to the schedule and requirements <br /> prescribed in the RAP. <br /> 2. Mining and milling operations associated with the Idarado Mine are not and were not operational <br /> during the permit year. No mining beneficiation or rock waste/tailing disposal operations were <br /> conducted during the permit year. <br /> 3. No new surface land disturbances were conducted in the 2013/2014 anniversary year. <br /> 4. During the 2012 field season the noxious weed control program continued with inspections and <br /> control measures conducted at the Telluride and Red Mountain permit areas according to the <br /> approved Weed Management Plan for the Idarado Mine Site. Weed control for mullein and <br /> Canada thistle has continued and populations of both species are lower due to the effectiveness of <br />