My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-01_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-07-01_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:50:08 AM
Creation date
7/2/2014 8:47:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/1/2014
Doc Name
Weekly CQA Report: Week ending 06/21/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO,'- <br /> CQA ACTIVITIES: <br /> I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling, production drilling and <br /> blasting; SLF moisture content and density testing; sampling and testing of drain cover fill (DCF)for <br /> QC, and sampling and testing of SF and SLF material for QA and QC; subgrade surface certification <br /> in the PSSA and Phase 2 diversion channel; and SLF surface inspection and certification. <br /> II) Laboratory Activities: Laboratory testing continued with permeability, particle size distribution, <br /> Atterberg limits, moisture-density relationships; gradations, material classification, and field material <br /> sampling were performed during this reporting period. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> ➢ Drain Cover Fill sample number DCF-90, DCF-91, DCF-92 and DCF-93 (control samples). <br /> Soil Liner Fill sample numbers SLF 10-R, 11-R, 12-R, 13-R and 14-R (record samples). <br /> Structural Fill sample numbers SF 84-R and 85-R (record samples). <br /> General Proiect Items <br /> Meetings and Discussions: Weekly Contractor Meeting—June 18, 2014 (CC&V, AMEC, Ames), <br /> CC&V Weekly Safety Professional Meeting—June 19, 2014; ECA daily safety meetings; and Ames daily <br /> safety meetings. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects, <br /> AMEC, and Ames. <br /> Miscellaneous: <br /> Drain cover fill crusher processing continued <br /> ➢ Riprap screen processing continued <br /> ➢ Soil liner fill placed at the PSSA was moisture conditioned <br /> Deliveries: None <br /> Submitted by: Date: June 25, 2014 <br /> Bobby Redd, El <br /> Reviewed by: < Date: June 25, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Approved By Date: A-7//-f- <br /> A roved �.y�.��n Date: u <br /> PP B Y �` ors" `tom!':rL/-'"� <br /> 2014.06.21-m1e2 weekly final Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.