Laserfiche WebLink
Page 3 of 4 <br /> 13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br /> If"NO"please explain: <br /> 14. If exploration has exposed groundwater, is the site in compliance with the approved mining pla nd Office of the <br /> State Engineer(Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? YES NO N/A <br /> 15. Are all hazardous materials stored within approved spill containment structures? YES NO N/ <br /> 16. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring information <br /> annually? YES NO N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report as required by Rule 1.15(l)(c). <br /> 17. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still in <br /> place and is adequate to fully reclaim the approved prospecting site dist�ur�b�aance(s). 1� <br /> FINANCIAL WARRANTY DOCUMENTATION ATTACHED: Vyy reC l ��►d C'l�W�� �r <br /> ON 9-14-ZO t 3 Fi v,-a,-vM1 IA' �k-i��r&w�.� S�i <br /> 18. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br /> the preceding year, including the locations and number of new surface drill holes,mud pits, excavations,rock dumps, <br /> adits, shafts,trenches,pits,roads and structures. If applicable,you must also describe the measures taken to safeguard <br /> shafts,adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br /> should be attached if needed. <br />