Laserfiche WebLink
z d) -,1977-- ,097 <br /> GOLD EAGLE MINING, INC. PO BOX 3007, MONTROSE, CO 81402, 970-596-2425 <br /> U.S. Department of Energy June 16, 2014 <br /> Office of Legacy Management <br /> David S. Shafer, PH.D. <br /> 11025 Dover St.,Suite 1000 <br /> Westminster,CO. 80021 <br /> Re:`60E Uranium Lease Reclamation Plan Approval Request <br /> JD-5 Mine, Burros Mine, Ellison Mine and Hawkeye Mine <br /> Dear Dr.Shafer, <br /> In accordance with the requirements of Gold Eagle Mining Inc.'s (GEMI) May 21, 2014 Stipulation and <br /> Declaratory Order (which was issued under the authority of Colorado Mined Land Reclamation Board) please <br /> find attached the now-approved reclamation plans for the above-captioned properties. The reclamation <br /> requirements were determined through discussions with the Colorado Division Reclamation Mining and Safety <br /> (DRMS) and DOE's representative, this in conjunction with a site visit and inspection convened on May 16, <br /> 2013. <br /> 3 The DOE was actively involved in the reclamation considerations and had responded to the reclamation plans <br /> previously on September 26, 2013 stating in part that: <br /> "The lessee shall return all disturbed areas to their original condition or a condition acceptable to the <br /> Realty Officer (emphasis added) promptly after damage to such areas has occurred and operation <br /> f under the Lease are no longer being conducted in the disturbed areas" <br /> Given that DOE's representative was present during the site visits (and had agreed to the plans determined in <br /> f <br /> the field at that time) GEMI believes that the conditions which will remain after reclamation remain consistent <br /> N with the DOE's requirement cited above, and should be accepted by the DOE "Realty Officer". Accordingly, <br /> t <br /> please consider these plans for approval within that context. <br /> r Please respond to GEMI's request as your earliest convenience, and if you should have any questions please <br /> contact me. <br /> Sincer y, <br /> 4 <br /> Y <br /> Don Coram, President <br /> Gold Eagle Mining Inc. <br /> CC: Ed Cotter-Uranium Leasing Program Lead <br /> S.M.Stoller Corporation <br /> Mr.Tony Waldron, DRMS <br /> Mr.Jeff Parson, INFORM <br /> i <br />