My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-01_REVISION - M1979191
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-07-01_REVISION - M1979191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:15 PM
Creation date
7/1/2014 10:59:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
Revision
Doc Date
7/1/2014
Doc Name
Preliminary Adequacy Review
From
DRMS
To
GEI Consultants, Inc.
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF THE ARMY <br /> CORPS OF ENGINEERS,OMAHA DISTRICT <br /> - DENVER REGULATORY OFFICE,9307 SOUTH WADSWORTH BOULEVARD <br /> LITTLETON,COLORADO 80128-6901 <br /> June 17'h,2014 RECEIVED <br /> Eric Scott JUN 2 5 2014 <br /> Environmental Protection Specialist OMSION OF RECLAMATION <br /> 1�13 Sherman Street,Room 215 MINING AND SAFETY <br /> Ilenver, CO 80203 <br /> RE: Notice of 112 Construction Materials Reclamation Permit Application Consideration <br /> Martin Marietta Materials,Inc,Three Bells Pit,File No.M-1979-191 <br /> Dear Mr. Scott <br /> If any work requires the discharge of dredged or fill material,and any excavation associated with <br /> a dredged or fill project, either temporary or permanent in an aquatic site,which may include ephemeral <br /> and/or perennial streams,wetlands, lakes,ponds,drainage ditches and irrigation ditches,this office <br /> should be notified by a proponent of the project for Department of the Army permits,changes in permit <br /> requirements or jurisdictional determinations pursuant to Section 404 of the Clean Water Act. <br /> Work in an aquatic site should be identified by the proponent of the project and be shown on a <br /> map identifying the Quarter Section,Township,Range and County,Latitude and Longitude,Decimal <br /> Degrees(example 39.55555; -104.55555)and the dimensions of work in each aquatic site. Any loss of <br /> an aquatic site may require mitigation. Mitigation requirements will be determined during the <br /> Department of the Army permitting review. <br /> Based on the information that was submitted to our office,it appears your project will not impact <br /> jurisdictional aquatic resources such as streams wetlands,and/or ditches. It is our understanding that <br /> there will be no dredged or fill material placed in any adjacent wetlands. Please note that any earth <br /> disturbances within these resources may require authorization from this office. <br /> Prior to starting work,a wetland delineation should be conducted to identify any aquatic resource <br /> that may exist within the project area. This should be field verified. Fills or earth disturbances within <br /> these streams and wetlands may require authorization from this office under Section 404 of the Clean <br /> Water Act. Please note that development of the upland areas,avoiding stream and wetland resources, <br /> does not require authorization from this office. <br /> If there are any questions,please call Mr.Michael Stanley of my office at 303-979-4120 <br /> Sincerely, <br /> C _ <br /> Kiel Dow <br /> Chief,Denver Regulatory Office <br />
The URL can be used to link to this page
Your browser does not support the video tag.