Laserfiche WebLink
r <br /> S <br /> 7 <br /> cC®LORAPO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> " 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 i <br /> 87�.. <br /> REO UEST FOR TECUMCAL REVISION{TR)COVER SHEET 7--3� 1 <br /> File No.: M- '978-34'2 Site Name: Ellison Mine <br /> County TR# (URAIS Use onW <br /> Permittee: Gold Eagle (Mining Inc. <br /> Operator(If Other than Penn ittee): DOn COram <br /> Permittee Representative: NA _ <br /> r <br /> Please provide a brief description of the proposed revision: <br /> A Technical Revision (TR) is being sought to eipport Final Reclamation of the Ellison Mine. <br /> ifles the edginal plan, as noted, in <br /> current conditions. <br /> As defined by_(lie Minerals Rules, a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more(flan a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the.qubmittal of a permit amendment to make the required or desired changes <br /> to the permit.. <br /> `rhe request for a TR is not coosideted"filed for review" until the appropriate The is received by the <br /> Division (as listed below by permit type). Please submit the appropriate The with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If tile Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to he addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittce requests additional �ime, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that acicurately depict the changes proposed in the requested'I'R. <br /> Required Fees for'rechnical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request For a Technical F evision. <br /> Permit Tvuc Required TR Fee Submitted (mark only one) <br /> 110c, l 11, 112 construction ii ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ F <br /> i <br /> i 1 0rl 1 1?r1!t 7 nr'tl R 1006 J <br /> I € <br />