My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-07-31_REVISION - M1978311
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978311
>
2013-07-31_REVISION - M1978311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:58 PM
Creation date
7/1/2014 10:59:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978311
IBM Index Class Name
Revision
Doc Date
7/31/2013
Doc Name
TR Submittal
From
Gold Eagle Mining Inc.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLOR ADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 131�Sherman Street,Room 715,Denver,Colorado 80203 hh(303)866-3567 <br /> REQU 6STFORTECHNICAL REVISION 0-12)COVE'R„SHEET 7,3//5 <br /> bile No.: M- ,1978-31 1 Site Name• Hawkeye Mine <br /> County TR# DRILLS Uve ail <br /> Pertnittee: Gold Eagle Mining Inc. <br /> Operator(if Other than Pennittee): Don COlram <br /> Permittec Representative:NA �~ <br /> Please provide a brief description of the proposed revision: <br /> A Technical Revision (TR) is being sought to support Final Reclamation of the Hawkeye Mine. <br /> a�i the original-pl . <br /> current conditions. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection P[*r." The Division is charged with determining if[lie revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope ofa TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate tee with your request to <br /> expedite the review process. Alter the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. if the Division requires additional information to approve a <br /> TR,you will be notified of spOcifc deficiencies that will need to he addressed. if at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined bormat for the submittal of TR;however,it is up to the permittee to provide <br /> suliicient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> IC Oc, l !1,t'I'yp <br /> I <br /> ! 0 - construction Required 'TR Fee Submitted (mark only one) <br /> [12 <br /> materials, and 112 quarries $216 <br /> i <br /> 112 hard rock(not DMO) $175 <br /> j <br /> I l Od. I l 2d(l, 2 or 3) $1006 �✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.