Laserfiche WebLink
t <br /> a <br /> STATE CIF COLORADO <br /> (VISION OF RECLAMATION,MINING AND SAFETY <br /> Department of Natural Resources <br /> 1313 Sherman St.,Room 215 <br /> Denver,Colorado 80203 C O L O RA D O <br /> Phone:(303)866-3567 D I v I s i o N o r <br /> FAX,(303)832-8106 RECLAMATION <br /> MINING <br /> SAFETY <br /> // John W.Hickenlooper <br /> `December 9,2013 Governor <br /> Mike Fling <br /> ,Mr. Don Coram Executive Director <br /> ✓Gold Eagle Mining,Inc. Loretta E Pineda <br /> P.O.Box 3007 Director <br /> Montrose,CO 81401 <br /> Re: Ellison Mine,Permit M-197042,Technical Revision TR-04,Technical Revision Adequate, <br /> Revision Approved <br /> Dear Mr. Coram, <br /> The Division has reviewed the Technical Revision referenced above, including the adequacy response <br /> letter and annotated map received by the Division on December 6,2013, from Gold Eagle Mining,Inc. <br /> ("Gold Eagle"or"operator"). Review of the final materials shows that the requirements of the Division's <br /> F-lard Rock and Metals Rule 3 and Rule 6.3 have been satisfied. <br /> Except for the completion date proposed in Gold Eagle's submittal,the revised reclamation plan,as set <br /> forth in Technical Revision TR-04,has been approved by the Division,effective as of December 6,2013. <br /> The specific details of the revised reclamation plan address current conditions for disturbances created <br /> after issuance of the permit and are the basis of the Division's approval as discussed below. <br /> 1. Portal.The current portal structure consists of a lockable,steel portal grate attached to the arched, <br /> steel portal cover. The structure is in good condition and provides secure safeguarding of the <br /> underground opening. The DOE has communicated no conflicting requirement regarding the <br /> portal. As such,there is no adit backfilling,modification or structural removal required. <br /> 2. Galvanized steel building. The building is in good condition,and is consistent with an <br /> agricultural post-mining laud use. Since it appears to be in conformance with the DOE, it may <br /> remain as a permanent structure,with no modification or removal required. <br /> 3. Buried water tank. The tank may retnain in place for later livestock use. <br /> 4. Steel storage containers. The two modular storage containers are in good condition and were not <br /> permitted to contain contaminants. One is owned by the DOE and one is owned by the operator. <br /> The DOE has provided no statement regarding the removal of the DOE-owned container,nor has <br /> DOE provided a letter indicating that the operator is required to remove its container. The <br /> containers are consistent with the proposed post-mining land use,and the revised reclamation <br /> plan is approved to allow both containers to remain permanently. <br /> Page 1 <br /> I <br /> Office of Office of <br /> Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />