Laserfiche WebLink
June 3, 2014 C- 1981- 008/New Horizon Mine MPB <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />Haul roads and access roads were in good condition throughout the site. Road ditches were dry and well <br />maintained. Culverts were clear of sediment and debris and functioning properly. <br />SUPPORT FACILITIES - Rule 4.04: <br />The surface facilities area was inspected. The site was maintained and no problems were noted. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.063; Redistribution 4.06.4: <br />Topsoil redistribution at the Morgan Property was observed during this inspection. An overview of the Morgan <br />property showing the topsoil stockpiles is shown in Photograph No 3. From left to right in the photo are the mixed <br />topsoil pile, A Pile, and B Pile, respectively. The Morgan property with the B Pile redistribution completed is <br />shown in Photograph No. 4. At the time of the inspection the A Pile was being loaded and hauled to the west end <br />of the property for placement see Photo No 5. A water truck was being used for dust suppression. <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 3 of 7 <br />