My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-30_REVISION - C1981013
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2014-06-30_REVISION - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:08 PM
Creation date
6/30/2014 12:32:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
6/30/2014
Doc Name
Letter & Application (Emailed)
From
New Elk Coal Company, LLC
To
DRMS
Type & Sequence
MR85
Email Name
BFB
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
@•C <br />*. *6 COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 013 Date: 06 /22 /2014 <br />Permittee: New Elk Coal Company, LLC <br />Golden Eagle Mine <br />Street: 122 West First St. <br />City: Trinidad <br />State: Co Zip Code: 81082 _ <br />Brief Description of Revision: Update Section 2.05.4(e) <br />Reclamation Plan (pages 21 -23) <br />Public Notice Attached: Yes <br />No <br />F✓ <br />(Required for PRs and TRs) <br />Bond Increase: Yes No®✓ <br />Federal F1 Non - Federal ® Mine <br />Proposed Change in: <br />Permit Area - <br />Surface Ownership - <br />Disturbed ( + / -)0 _ _ —Acres <br />Private Land ( + / -) _ _ _ —Acres <br />Permit ( + / -)0 _ _ _ <br />Acres Federal Land ( + / -) _ _ _ _ <br />Acres <br />Affected ( + / -)0 _ _ —Acres <br />State Land ( + / -) _ _ _ —Acres <br />Mineral Ownership - <br />Mineral Private ( + / -) _ _ <br />—.—Acres Mineral State ( + / -) _ _ _ —Acres <br />Mineral Federal ( + / -) _ _ <br />_ —Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.