Laserfiche WebLink
PERMIT#:M-1981-185 <br /> INSPECTOR'S INITIALS:KAP <br /> INSPECTION DATE:June 4,2014 <br /> OBSERVATIONS <br /> This inspection was conducted as part of the Division of Reclamation, Mining and Safety ongoing monitoring of <br /> the installation of the access road to the site and fulfillment of corrective actions imposed by the Mined Land <br /> Reclamation Board. <br /> The retaining wall plans have changed slightly to accommodate the position of the bedrock relative to the <br /> engineered plans. The size of the wall will be expanded. The base of the wall is installed. Another change to <br /> the design plans involves a modification to the drain for the outlet structure. The plans show that it will be <br /> constructed of concrete but that will take over 11 months, according to Mr. Taylor. Instead, he is proposing <br /> that a metal drain be welded. Information regarding this change was forwarded to Dusting for communication <br /> with George Robinson. <br /> The road near the bridge was raised up with fill. <br /> Page 2 of 4 <br />