Laserfiche WebLink
RECE/V <br /> Page2of3 <br /> PLO JON 2 ?�-014 <br /> 112c Annual Report DIVISIO14OF�EC <br /> 1,%;V6 ; a'AT10 <br /> Permittee Name: Southway Construction Permit Number: M-1984-026 VCly <br /> Company, Inc. <br /> Operation Name: Del Norte Pit County: Rio Grande <br /> Annual Fee.Due: $791.00 Anniversary Date: June 22,2014 <br /> Permit Acreage: 70.60 Current Bond Amt: $238,311.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year,on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES <br /> b)approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). —7- <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres 2, <br /> backfilled: seeded w/ w/topsoil Z� mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded;, � /o fertilized w/ 2 replacement � rate(tons/ac): <br /> K vd fertilizer: depth p � (in.)a d : <br /> Seed Fertilize Mulch <br /> application application application <br /> method: method: method: <br />