Laserfiche WebLink
RULE 6.4.11 EXHIBIT "L" <br /> ZECLAMATION COST <br /> LONE TREE GRAVEL PIT EXTENDED <br /> QTY. UNIT UNIT COST COST <br /> 1.) REVEGETATION SEEDING &PREP. 40 AC $0.00 $0 <br /> la.) ESTIMATED FAILURE RATE 40% 16 AC $0.00 $0 <br /> 2.) CHISEL(RIP) STOCKPILE/PROCESS AREA 5 AC $0.00 $0 <br /> 3.) GRADE PIT FLOOR 5 AC $0.00 $0 <br /> 4.) BACKFILL OVERBURDEN FROM THE PIT WALLS & BERMS 0 LCY $0.00 $0 <br /> 5.) SPREAD TOPSOIL FROM BERMS&STOCKPILES 32250 LCY $0.00 $0 <br /> 6.) MULCH 40 AC $0.00 $0 <br /> 7.) WEED CONTROL 40 AC $0.00 $0 <br /> 8.) MOB/DEMOB CAT D8N 1 LS $0.00 $0 <br /> 9.) MOBILIZATION &DEMOBILIZATION AL OTHER IMPLIMENTS &TRACTORS 1 LS $0.00 $0 <br /> TOTAL DIRECT COST $0 <br /> INDIRECT COST <br /> PUBLIC LIABILITY INSURANCE 1.55% $0 <br /> CONTRACTOR PERFORMANCE BOND COST 1.05% $0 <br /> CONTRACTOR PROFIT 10.00% $0 <br /> DIVISION OF MINERALS&GEOLOGY ADMIN. EXPENSE 5.00% $0 <br /> ADDITIONAL SUPERVISION 4.00% $0 <br /> ENGINEERING WORK 0.00% $0 <br /> DMG ADMIN. FEES 5.00% $0 <br /> CONTINGENCY 2.00% $0 <br /> TOTAL BOND AMOUNT $0 <br />