My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-27_PERMIT FILE - M2014034
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014034
>
2014-06-27_PERMIT FILE - M2014034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:05 PM
Creation date
6/27/2014 4:17:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014034
IBM Index Class Name
Permit File
Doc Date
6/27/2014
Doc Name
New application
From
Huerfano County Government
To
DRMS
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.1 Establishing Post-Mining Use <br /> (1) The Operator/Applicant, in consultation with the Landowner, have decided to reclaim the <br /> affected area back to rangeland for a commercial cattle operation. <br /> (2) The results of the decisions were formulated into the reclamation plan. This application, of <br /> which this is a part, and all of the decisions formulated into it, constitute what the applicant <br /> believes is an appropriate and workable Reclamation Plan. <br /> 3.1.2 Reclaiming Substituted Land. <br /> Reclaiming substitute land is not a consideration of this operation. <br /> 3.1.3 Time Limit and Phased Reclamation <br /> The operator/applicant agrees that all reclamation shall be carried to completion with all <br /> reasonable diligence, and each phase shall be completed within five (5) years from the date <br /> the Operator/Applicant informs the Board or office that such phase has commenced. <br /> 3.1.4 Public Use <br /> The Operator/Applicant and Landowner do not propose the use of this land by the public. <br /> Mining will be done by an MSHA approved contractor and the public will not be allowed on <br /> site without a company representative, Part 46 of MSHA will be followed on this site. After the <br /> site has been released by the MINED LAND RECLAMATION BOARD, the Landowner may <br /> allow public access if it is deemed beneficial to the landowner. <br /> 3.1.5 Reclamation Measures - Material handling <br /> (1) Grading shall be carried on to create a final topography appropriate to the final land use <br /> selected in the Reclamation Plan. <br /> (2) Backfilling the excavated (mined) area will consist of overburden materials. Additionally all <br /> backfill material will be compacted in place to insure stability. No toxic or acid-forming <br /> materials will be on site nor will any be delivered to this mine site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.