My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-27_ENFORCEMENT - C2010089
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C2010089
>
2014-06-27_ENFORCEMENT - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:05 PM
Creation date
6/27/2014 8:04:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Enforcement
Doc Date
6/27/2014
Doc Name
Notice of Violation
From
DRMS
To
Western Fuels-Colorado, LLC
Violation No.
CV2014004
Email Name
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2014 -004 <br />NATURE OF VIOLATION: <br />Significant differences were identified between as -built documentation for NHN- OOlEast and West Ditches as <br />compared to site observations made during a complete inspection and combined OSM oversight inspection <br />conducted on June 3, 2014. The as -built documentation does not accurately replicate observed ground conditions <br />regarding the construction of the NHN -001 East and West Ditches. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S): <br />REGULATIONSECTION(S): 2.07.7(7) <br />PERMIT SECTION(S): C- 2010 -089; Volume 3, Section 2.0.5.3(4), Appendix 2.05.3 (4) -1 ARCADIS Report <br />on Sediment Control, Appendix 2.05.3(4) -7 NHN -001 Ditches As -Built <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: NHN -001 East Ditch Segments 1 -7 and <br />NHN- 00 IWest Ditch Segments 1 -3. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Abatement Step 4 Description <br />1 Reconstruct the sections of NHN -001 East and West Ditches that are currently not in <br />compliance with their original approved designs; or obtain approval of a Technical Revision <br />revising the original approved designs, in compliance with the requirements of Rule <br />2.05.3(4)(d), so as to conform to the on- the - ground construction. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Abatement Step 4 Due Date <br />1 September 15, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.