Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E (CONT) <br /> Reclamation Timetable <br /> The numbers presented below represent our estimate of the various <br /> areas of disturbance in the mine area. They may change as the <br /> actual mining progresses through the site . <br /> Table E-1: Reclamation Phases (Option B) <br /> ACRES <br /> t <br /> ` oTAL LAKE REvEGE- ROAD MISC. <br /> Area Years AREA TATION (DITCHES, UN- <br /> DISTURBED AR- <br /> EAS, RECLAIMED <br /> AREAS, ETC) <br /> Eastern Phase 3-5 28.08 6.10 14.73 1.55 5.70 <br /> Western Phase 3-5 53 .19 33.83 10.32 2.71 6.33 <br /> 'arra Property 0-1 9.36 0.00 0.00 0.00 9.36 <br /> otals 90.63 39.93 25.05 4.26 21.39 <br /> 11 (revised 6/20/2014) <br />